Guide for installation and configuration of electric locks
With the progress and development of science and technology, electronic access control system has become an indispensable part of modern architecture. Among them, electric lock, as an important safety control equipment, has been widely used in many places. This article will show you how to install and configure the electric lock correctly.
I. Preparations
Before starting the electric lock installation, please confirm the following points:
1. Confirm the type of door: select the appropriate electric lock according to the material (wooden door or iron door, etc.) and thickness of the door.
2. Preparation tools: common tools such as electric drill, screwdriver and measuring ruler.
3. Check whether the electric lock accessories are complete: generally including the electric lock body, magnetic disk, bracket and other parts.
4. Read the product manual and understand its working principle and usage.
Second, the installation steps
(1) measurement and positioning:
Determine the position of the electric lock according to the actual needs and mark it with a pen. Usually, it is appropriate to install the electric lock at a height of about 1.2 meters from the ground. Pay attention to ensure a certain gap between the electric lock and the magnetic disk (refer to the instructions provided by the manufacturer for specific values).
(2) Punching and fixing:
Punch holes in the pre-marked position with an electric drill, and then fix the electric lock and the magnetic sheet with screws. If conditions permit, you can ask an assistant to help hold the electric lock and the magnetic disk to ensure that they are in the correct relative position during the process.
(3) Connecting lines:
Connect the power cord and signal cord (if necessary) according to the requirements in the manual. Be sure.Make sure all wires are connected correctly before proceeding to the next operation!
Third, the configuration process
After the operation on the physical level is completed, the related software needs to be set to realize the complete function:
(1) Access the network/Bluetooth module (if necessary);
(2) Install the supporting APP and register the account to log in;
(3) Add new equipment and complete the distribution process according to the prompt;
Fourth, debugging and testing
The last step is to conduct a comprehensive and detailed inspection of the whole system to verify whether it can operate normally:
(1) simulate entering and leaving the scene to observe the reaction speed and sensitivity;
(2) Check the status of the power indicator lamp to determine whether the remaining power is sufficient;
(3) If you encounter any problems, you should contact the after-sales service department for help.
To sum up, it is "measurement-fixing-connection-configuration". I hope that the above content can help everyone to complete the task smoothly!
Rec. Prods.
标签:
本文地址:https://tepinji.com/Machi/3761.html